Guernsey High School gets upgraded with Prysmian
Posted: 17/01/11 09:45:00

Guernsey High School gets upgraded with Prysmian

Prysmian Afumex LSX™ and FP Plus™ have been specified and installed at the new campus for Les Beaucamps High School in Guernsey. Afumex LSX™ will supply general lighting and power in all main classrooms, offi ces and service corridors. FP Plus™ forms part of the fi re alarm system with its enhanced performance. Safety for staff and pupils is of paramount importance and with this in mind Lauren Lloyd (Guernsey) Ltd, opted for Prysmian in their installation at the new facility.

The main contractor at Les Beaucamps site, RG Falla, also based in Guernsey, engaged Lauren Lloyd for the electrical work at the site. Installation began in October 2011, with 35km of Afumex LSX™ 1.5mm² to 4mm², two and three core and also 10km of two core 1.5mm² FP Plus™

Contracts Director Gavin Charles, at Lauren Lloyd explains: ‘Afumex LSX™ was used on this project as an alternative to PVC Twin and Earth as this is a more robust alternative with a better reaction to fi re. This was my fi rst experience of Afumex LSX™ and I am very happy with the results.’

Afumex LSX™ is a low smoke zero halogen (LSOH) cable with fl ame retardant properties, a safer alternative to PVC in the event of a fi re. Afumex LSX™ will self extinguish when the fl ame is removed producing low volumes of smoke, free from toxic halogen acid gases present in the PVC alternative.

Prysmian’s FP Plus™ with enhanced Insudite™ insulation provides an unmatched combination of rigidity and fl exibility resulting in an easy installation for an enhanced cable. Both FP Plus™ and Afumex LSX™ achieve full compliance with test requirements including BASEC and LPCB approval.

Les Beaucamps High School currently houses 500 students and additional facilities are being added to cater for an increased intake.

The new facilities are being built adjacent to the current school so that the pupils can carry on with their studies undisturbed. The school is currently in the fi rst phase of the £30 million redevelopment due for completion July 2012, with the second phase, following the demolition of the old school, providing a sports hall, swimming pool and external sports facilities ready for completion in December 2013.


FP News
Prysmian cables help protect water plants on the Isles of Scilly
Prysmian cables help protect water plants on the Isles of Scilly

Read More

View all >
FP Updates
BS5266 Guide
A guide to the selection of cable types for particular building applications
VIew all >
FP Stockists
stockist
Stockist Locator >